Auto Car CNC Machinery Motorcycle Oil Pump Lock Tools Textile Diesel Engine Gearbox Reducer Transmission Bearing Gear Spare Powder Metallurgy Parts

Still deciding? Get samples of $ !
Order Sample

Product Description

Basic Information

Model NO.
KZBA001
Condition
New
Certification
ISO9001, IATF16949
Standard
DIN, ASTM, GOST, GB, JIS, ANSI, BS
Process
Powder Metallurgy
Material
Iron, Copper, Stainless Steel
Production Capacity
50,000 Pieces/Day
HS Code
8479909090

Product Description

Powder Metallurgy Parts

Excellent powder metallurgy parts metallic sintered parts.
We offer various powder metallurgy parts including iron-based and copper-based with top quality. We can manufacture parts according to customer drawings or samples to meet specific requirements.

How We Work with Our Clients

1
Design Experts: Send a full RFQ pack including drawings, 3D models, and quantities.
2
New Projects: Simply share your idea; our team will guide you through the process.
3
Quick Response: Sales team replies within 24 hours to confirm details.
4
Engineering: Evaluation and formal offer provided within 1-3 working days.
Workflow

Technical Specifications

TypePowder metallurgy sintering
MaterialIron, stainless steel, copper
Mould TypeTungsten steel
Material StandardMPIF 35, DIN 30910, JIS Z 2550
ApplicationAutomobile, Electric tools, Locksets, Home appliances
Quality Control100% inspection with Carl Zeiss equipment
ProcessingPowder Metallurgy, CNC Machining
Secondary ProcessHigh frequency quenching, oil immersion

Product Display

Production Details

The Advantage of Powder Metallurgy

Cost Effective

Reduces material waste and eliminates or shortens machining processes.

Complex Shapes

Allows for complex geometries like teeth and splines directly from tooling.

High Precision

Achieves IT 8-9 tolerances as sintered, and up to IT 5-7 after sizing.

Self-lubrication

Interconnected porosity can be filled with oil for constant lubrication.

Equipment

Frequently Asked Questions

How do you guarantee high quality?
We perform 100% inspection using Carl Zeiss high-precision testing equipment to ensure every product meets appearance and pressure standards.
What is the typical delivery time?
Generally, it takes 25 to 35 days after advance payment. Non-standard items may require an additional 10-15 days for tooling and mould creation.
Can you produce from samples or drawings?
Yes, we can produce based on your physical samples or technical drawings, and we are capable of building the necessary molds and fixtures.
How does the tooling charge work?
Tooling is charged only once with the first order. Future orders will not incur tooling charges, even for repairs or maintenance.
What is your payment policy?
Usually, a 50% prepayment of the total amount is required, with the remaining balance paid off before shipment.
What is your sample policy?
We can supply samples if parts are in stock, but customers are responsible for the sample cost and courier fees.

Related Products