Truck Parts Customized Cheap Auto Transmission Systems Brake System for Volvo Parts

Still deciding? Get samples of $ !
Request Sample

Product Description

1 Basic Information
MaterialCarbon / SteelCertificationISO14001, ISO/TS16949, ISO9001, CCC
PositionAll PartsOEMAvailable
TypeSuspension Spring / Semi Trailer SuspensionModelYH Series (10.2001, 16.3201B, etc.)
Carrying Capacity11000kg to 33000kg (Max 105T)Leaf Springs3-13 PCS
QualityHigh LevelOriginChina
Transmission Systems
Brake System
2 Technical Parameters
StructureSingle/Tandem/Tri Suspension
Weight Capacity1.1T ~ 105T
MOQ1 Pair
Warranty6 Months
FeaturesHigh Quality, Competitive Price, OEM Accepted
3 Product Description & Highlights

We are mainly engaged in various types of semi-trailer axles, semi-trailer landing gears, suspension systems and accessories. We insist on the business spirit of "Quality As Top". We are increasingly expanding our international market share based on quality products, excellent services, and timely delivery.

Advanced Design
CTC axles integrate advanced engineering concepts. Its structure is compact and sturdy, maintaining excellent stability when carrying heavy objects, providing a solid foundation for vehicle operation.
Strong Performance
Demonstrates strong driving force transmission capabilities, ensuring sufficient power for starting, accelerating, and climbing with smooth braking coordination.
Superior Durability
Made of high-quality materials subjected to strict processing, capable of withstanding harsh road conditions and reducing maintenance costs for users.
Axle Design
Axle Performance
Axle Durability
4 Quality Assurance & Manufacturing
Factory Overview
Cert 1
Cert 2
Cert 3
5 Exhibition & Logistics
Exhibition
Cases
Packaging
Shipping 1
Shipping 2
? Frequently Asked Questions
What are your terms of packing?
Generally, we package goods with fumigation-free wooden holders in brown boxes. Branded boxes are available upon authorization for legally registered patents.
What is your terms of payment?
T/T 30% as deposit, and 70% before delivery. We will provide photos of products and packages before final payment.
What are your delivery terms?
We offer FOB, CIF, DDU, and EXW delivery terms.
How long is the delivery time?
Typically, it takes 5 to 10 days after receiving your advance payment, depending on the items and order quantity.
Can you produce based on samples?
Yes, we can manufacture according to your samples or technical drawings, including building necessary molds and fixtures.
Do you test goods before delivery?
Yes, we perform 100% testing on all products before they are dispatched to ensure quality.

Related Products